Elam Trail over Pack Saddle Creek
FairPosted for loadScott County, Arkansas · 0.26 N HWY 71 · Structure no. 000000000016748
- Built
- 1940
- 85 years old, rebuilt 1984
- Condition
- Fair
- inspected July 2024
- Type
- Channel Beam
- Concrete
- Length
- 40 ft
- 2 main spans
- Daily traffic
- 89
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
Elam Trail over Pack Saddle Creek is a concrete channel beam carrying Elam Trail over Pack Saddle Creek in Scott County, Arkansas. It was built in 1940 and reconstructed in 1984, so it is 85 years old, older than the Arkansas average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 89 vehicles a day, roughly 1% of them trucks, projected to reach 32 by 2007. The structure is 40 ft (12.2 m) long and 15 ft wide. If it were closed, the detour would be 124.3 mi (200 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Elam Trail over Pack Saddle Creek built?
It was built in 1940, making it 85 years old in 2025. It was reconstructed in 1984.
What condition is Elam Trail over Pack Saddle Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does Elam Trail over Pack Saddle Creek carry?
About 89 vehicles per day (2018 count), of which roughly 1% are trucks.
How long is Elam Trail over Pack Saddle Creek?
The structure is 40 ft (12.2 m) long with a longest span of 20 ft (6.1 m) and a deck 15 ft wide.
Who owns Elam Trail over Pack Saddle Creek?
It is owned by the County Highway Agency.