US Bridges

CR 48 Lk Winona RD over Saline River Relief

Good

Saline County, Arkansas · .8MI W SH9 · Structure no. 000000000023838

Built
2015
10 years old
Condition
Good
inspected February 2024
Type
Culvert
Concrete
Length
32 ft
3 main spans
Daily traffic
60
2018 count
Owner
County
County Highway Agency

About this bridge

CR 48 Lk Winona RD over Saline River Relief is a concrete culvert carrying CR 48 Lk Winona RD over Saline River Relief in Saline County, Arkansas. It was built in 2015, so it is 10 years old, younger than the Arkansas average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 60 vehicles a day, roughly 3% of them trucks, projected to reach 385 by 2032. The structure is 32 ft (9.9 m) long. If it were closed, the detour would be 9.9 mi (16 km).

CarriesCR 48 Lk Winona RD
CrossesSaline River Relief
Location.8MI W SH9
RouteCounty Highway 48
Coordinates34.80536, -92.78979
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating58 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHL 93
Structure length32 ft (9.9 m)
Longest span10 ft (3.2 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic60 (2018)
Projected traffic385 by 2032
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was CR 48 Lk Winona RD over Saline River Relief built?

It was built in 2015, making it 10 years old in 2025.

What condition is CR 48 Lk Winona RD over Saline River Relief in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does CR 48 Lk Winona RD over Saline River Relief carry?

About 60 vehicles per day (2018 count), of which roughly 3% are trucks.

How long is CR 48 Lk Winona RD over Saline River Relief?

The structure is 32 ft (9.9 m) long with a longest span of 10 ft (3.2 m).

Who owns CR 48 Lk Winona RD over Saline River Relief?

It is owned by the County Highway Agency.