2nd Street Benton over UPRR Willow ST Depo Crk
GoodSaline County, Arkansas · 0.1 MI So of SH 35 · Structure no. 000000000006590
- Built
- 1996
- 29 years old
- Condition
- Good
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 600 ft
- 8 main spans
- Daily traffic
- 66
- 2018 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
2nd Street Benton over UPRR Willow ST Depo Crk is a steel continuous stringer/multi-beam or girder carrying 2nd Street Benton over UPRR Willow ST Depo Crk in Saline County, Arkansas. It was built in 1996, so it is 29 years old, younger than the Arkansas average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 66 vehicles a day, roughly 1% of them trucks, projected to reach 2,371 by 2014. The structure is 600 ft (182.9 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 2nd Street Benton over UPRR Willow ST Depo Crk built?
It was built in 1996, making it 29 years old in 2025.
What condition is 2nd Street Benton over UPRR Willow ST Depo Crk in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.
How much traffic does 2nd Street Benton over UPRR Willow ST Depo Crk carry?
About 66 vehicles per day (2018 count), of which roughly 1% are trucks.
How long is 2nd Street Benton over UPRR Willow ST Depo Crk?
The structure is 600 ft (182.9 m) long with a longest span of 114 ft (34.7 m) and a deck 41 ft wide.
Who owns 2nd Street Benton over UPRR Willow ST Depo Crk?
It is owned by the City or Municipal Highway Agency.