I-40EB/SE51/259.75 over Shell Lake
GoodSt. Francis County, Arkansas · 0.14 MI W of JCT 149&40 · Structure no. 000000000006939
- Built
- 2017
- 8 years old
- Condition
- Good
- inspected April 2022
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 560 ft
- 8 main spans
- Daily traffic
- 39,000
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
I-40EB/SE51/259.75 over Shell Lake is a steel continuous stringer/multi-beam or girder carrying I-40EB/SE51/259.75 over Shell Lake in St. Francis County, Arkansas. It was built in 2017, so it is 8 years old, younger than the Arkansas average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 39,000 vehicles a day, roughly 56% of them trucks, projected to reach 38,000 by 2035. The structure is 560 ft (170.7 m) long and 131 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-40EB/SE51/259.75 over Shell Lake built?
It was built in 2017, making it 8 years old in 2025.
What condition is I-40EB/SE51/259.75 over Shell Lake in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2022.
How much traffic does I-40EB/SE51/259.75 over Shell Lake carry?
About 39,000 vehicles per day (2018 count), of which roughly 56% are trucks.
How long is I-40EB/SE51/259.75 over Shell Lake?
The structure is 560 ft (170.7 m) long with a longest span of 72 ft (21.9 m) and a deck 131 ft wide.
Who owns I-40EB/SE51/259.75 over Shell Lake?
It is owned by the State Highway Agency.