CR-625/Z-A/L-1.76 over Mill Seed Drainage
FairSt. Francis County, Arkansas · 1.76 Miles South of SH 38 · Structure no. 000000000004410
- Built
- 1982
- 43 years old
- Condition
- Fair
- inspected March 2025
- Type
- Channel Beam
- Concrete
- Length
- 248 ft
- 8 main spans
- Daily traffic
- 329
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
CR-625/Z-A/L-1.76 over Mill Seed Drainage is a concrete channel beam carrying CR-625/Z-A/L-1.76 over Mill Seed Drainage in St. Francis County, Arkansas. It was built in 1982, so it is 43 years old, younger than the Arkansas average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 329 vehicles a day, roughly 1% of them trucks, projected to reach 234 by 2007. The structure is 248 ft (75.6 m) long and 31 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR-625/Z-A/L-1.76 over Mill Seed Drainage built?
It was built in 1982, making it 43 years old in 2025.
What condition is CR-625/Z-A/L-1.76 over Mill Seed Drainage in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2025.
How much traffic does CR-625/Z-A/L-1.76 over Mill Seed Drainage carry?
About 329 vehicles per day (2018 count), of which roughly 1% are trucks.
How long is CR-625/Z-A/L-1.76 over Mill Seed Drainage?
The structure is 248 ft (75.6 m) long with a longest span of 31 ft (9.4 m) and a deck 31 ft wide.
Who owns CR-625/Z-A/L-1.76 over Mill Seed Drainage?
It is owned by the County Highway Agency.