Geyer Springs Road over Union Pacific Rail Road
GoodPulaski County, Arkansas · 0.2 Miles N of W 65 ST · Structure no. 000000000024039
- Built
- 2020
- 5 years old
- Condition
- Good
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 130 ft
- 1 main span
- Daily traffic
- 9,300
- 2019 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Geyer Springs Road over Union Pacific Rail Road is a steel stringer/multi-beam or girder carrying Geyer Springs Road over Union Pacific Rail Road in Pulaski County, Arkansas. It was built in 2020, so it is 5 years old, younger than the Arkansas average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 9,300 vehicles a day, roughly 3% of them trucks, projected to reach 12,000 by 2015. The structure is 130 ft (39.6 m) long and 63 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Geyer Springs Road over Union Pacific Rail Road built?
It was built in 2020, making it 5 years old in 2025.
What condition is Geyer Springs Road over Union Pacific Rail Road in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.
How much traffic does Geyer Springs Road over Union Pacific Rail Road carry?
About 9,300 vehicles per day (2019 count), of which roughly 3% are trucks.
How long is Geyer Springs Road over Union Pacific Rail Road?
The structure is 130 ft (39.6 m) long with a longest span of 127 ft (38.6 m) and a deck 63 ft wide.
Who owns Geyer Springs Road over Union Pacific Rail Road?
It is owned by the City or Municipal Highway Agency.