US Bridges

Waterside DR over Ison Creek

Good

Pulaski County, Arkansas · 0.3 MI N of HWY 10 · Structure no. 000000000023841

Built
2017
8 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
110 ft
2 main spans
Daily traffic
100
2017 count
Owner
City
City or Municipal Highway Agency

About this bridge

Waterside DR over Ison Creek is a steel stringer/multi-beam or girder carrying Waterside DR over Ison Creek in Pulaski County, Arkansas. It was built in 2017, so it is 8 years old, younger than the Arkansas average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, roughly 1% of them trucks, projected to reach 115 by 2037. The structure is 110 ft (33.5 m) long and 34 ft wide.

CarriesWaterside DR
CrossesIson Creek
Location0.3 MI N of HWY 10
RouteCity Street 60920
Coordinates34.80516, -92.438
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length110 ft (33.5 m)
Longest span54 ft (16.6 m)
Deck width34 ft (10.4 m)
Roadway width22 ft (6.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2017)
Projected traffic115 by 2037
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Waterside DR over Ison Creek built?

It was built in 2017, making it 8 years old in 2025.

What condition is Waterside DR over Ison Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Waterside DR over Ison Creek carry?

About 100 vehicles per day (2017 count), of which roughly 1% are trucks.

How long is Waterside DR over Ison Creek?

The structure is 110 ft (33.5 m) long with a longest span of 54 ft (16.6 m) and a deck 34 ft wide.

Who owns Waterside DR over Ison Creek?

It is owned by the City or Municipal Highway Agency.