US Bridges

Ramp over Ramps 18 and 19

Good

Pulaski County, Arkansas · .15 M W of HWY10/I430 · Structure no. 000000000007433

Built
2021
4 years old
Condition
Good
inspected September 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
90 ft
1 main span
Daily traffic
9,100
2020 count
Owner
State
State Highway Agency

About this bridge

Ramp over Ramps 18 and 19 is a steel stringer/multi-beam or girder carrying Ramp over Ramps 18 and 19 in Pulaski County, Arkansas. It was built in 2021, so it is 4 years old, younger than the Arkansas average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,100 vehicles a day, roughly 2% of them trucks, projected to reach 10,920 by 2040. The structure is 90 ft (27.4 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesRamp
CrossesRamps 18 and 19
Location.15 M W of HWY10/I430
RouteState Highway 10
Coordinates34.78984, -92.39151
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionSeptember 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length90 ft (27.4 m)
Longest span88 ft (26.8 m)
Deck width36 ft (11 m)
Roadway width33 ft (10.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,100 (2020)
Projected traffic10,920 by 2040
Trucks2%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ramp over Ramps 18 and 19 built?

It was built in 2021, making it 4 years old in 2025.

What condition is Ramp over Ramps 18 and 19 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does Ramp over Ramps 18 and 19 carry?

About 9,100 vehicles per day (2020 count), of which roughly 2% are trucks.

How long is Ramp over Ramps 18 and 19?

The structure is 90 ft (27.4 m) long with a longest span of 88 ft (26.8 m) and a deck 36 ft wide.

Who owns Ramp over Ramps 18 and 19?

It is owned by the State Highway Agency.