US Bridges

I 630 EB Log 5.48 over Miss Ave Rushing Creek

Good

Pulaski County, Arkansas · 1.7 E of I-430 · Structure no. 000000000007383

Built
2019
6 years old
Condition
Good
inspected January 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
430 ft
4 main spans
Daily traffic
100,565
2016 count
Owner
State
State Highway Agency

About this bridge

I 630 EB Log 5.48 over Miss Ave Rushing Creek is a steel continuous stringer/multi-beam or girder carrying I 630 EB Log 5.48 over Miss Ave Rushing Creek in Pulaski County, Arkansas. It was built in 2019, so it is 6 years old, younger than the Arkansas average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100,565 vehicles a day, roughly 3% of them trucks, projected to reach 102,000 by 2039. The structure is 430 ft (131.1 m) long and 138 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI 630 EB Log 5.48
CrossesMiss Ave Rushing Creek
Location1.7 E of I-430
RouteInterstate 630
Coordinates34.74566, -92.3588
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating43 US tons
Inventory rating33 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length430 ft (131.1 m)
Longest span119 ft (36.3 m)
Deck width138 ft (42.2 m)
Roadway width68 ft (20.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100,565 (2016)
Projected traffic102,000 by 2039
Trucks3%
Lanes on structure8
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and waterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was I 630 EB Log 5.48 over Miss Ave Rushing Creek built?

It was built in 2019, making it 6 years old in 2025.

What condition is I 630 EB Log 5.48 over Miss Ave Rushing Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does I 630 EB Log 5.48 over Miss Ave Rushing Creek carry?

About 100,565 vehicles per day (2016 count), of which roughly 3% are trucks.

How long is I 630 EB Log 5.48 over Miss Ave Rushing Creek?

The structure is 430 ft (131.1 m) long with a longest span of 119 ft (36.3 m) and a deck 138 ft wide.

Who owns I 630 EB Log 5.48 over Miss Ave Rushing Creek?

It is owned by the State Highway Agency.