Southeastern RD over Bayou Meto
GoodPulaski County, Arkansas · .67 MI S SH 294 · Structure no. 000000000004654
- Built
- 1993
- 32 years old
- Condition
- Good
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 152 ft
- 3 main spans
- Daily traffic
- 48
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
Southeastern RD over Bayou Meto is a prestressed concrete stringer/multi-beam or girder carrying Southeastern RD over Bayou Meto in Pulaski County, Arkansas. It was built in 1993, so it is 32 years old, younger than the Arkansas average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 48 vehicles a day, roughly 5% of them trucks, projected to reach 110 by 2038. The structure is 152 ft (46.3 m) long and 31 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Southeastern RD over Bayou Meto built?
It was built in 1993, making it 32 years old in 2025.
What condition is Southeastern RD over Bayou Meto in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does Southeastern RD over Bayou Meto carry?
About 48 vehicles per day (2018 count), of which roughly 5% are trucks.
How long is Southeastern RD over Bayou Meto?
The structure is 152 ft (46.3 m) long with a longest span of 50 ft (15.2 m) and a deck 31 ft wide.
Who owns Southeastern RD over Bayou Meto?
It is owned by the County Highway Agency.