CR 675 Zone B over Big Fork Creek Polk Co.
GoodPolk County, Arkansas · 0.13 MI NE JCT HWY 8 · Structure no. 000000000024243
- Built
- 2022
- 3 years old
- Condition
- Good
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 68 ft
- 1 main span
- Daily traffic
- 30
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
CR 675 Zone B over Big Fork Creek Polk Co. is a steel stringer/multi-beam or girder carrying CR 675 Zone B over Big Fork Creek Polk Co. in Polk County, Arkansas. It was built in 2022, so it is 3 years old, younger than the Arkansas average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 30 vehicles a day, roughly 1% of them trucks, projected to reach 62 by 2007. The structure is 68 ft (20.6 m) long and 24 ft wide. If it were closed, the detour would be 19.9 mi (32 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 675 Zone B over Big Fork Creek Polk Co. built?
It was built in 2022, making it 3 years old in 2025.
What condition is CR 675 Zone B over Big Fork Creek Polk Co. in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.
How much traffic does CR 675 Zone B over Big Fork Creek Polk Co. carry?
About 30 vehicles per day (2018 count), of which roughly 1% are trucks.
How long is CR 675 Zone B over Big Fork Creek Polk Co.?
The structure is 68 ft (20.6 m) long with a longest span of 68 ft (20.6 m) and a deck 24 ft wide.
Who owns CR 675 Zone B over Big Fork Creek Polk Co.?
It is owned by the County Highway Agency.