SH 118-02-LM 4.23 over Tyronza River
PoorPoinsett County, Arkansas · 1.8 MI N JCT US 63 · Structure no. 0000000000A3872
- Built
- 1964
- 61 years old, rebuilt 1975
- Condition
- Poor
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 291 ft
- 5 main spans
- Daily traffic
- 440
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
SH 118-02-LM 4.23 over Tyronza River is a steel stringer/multi-beam or girder carrying SH 118-02-LM 4.23 over Tyronza River in Poinsett County, Arkansas. It was built in 1964 and reconstructed in 1975, so it is 61 years old, older than the Arkansas average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 3 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 440 vehicles a day, roughly 1% of them trucks, projected to reach 546 by 2028. The structure is 291 ft (88.6 m) long and 29 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 3 Serious | Loss of section, deterioration, spalling or scour have seriously affected primary structural components. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 118-02-LM 4.23 over Tyronza River built?
It was built in 1964, making it 61 years old in 2025. It was reconstructed in 1975.
What condition is SH 118-02-LM 4.23 over Tyronza River in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in June 2024.
How much traffic does SH 118-02-LM 4.23 over Tyronza River carry?
About 440 vehicles per day (2018 count), of which roughly 1% are trucks.
How long is SH 118-02-LM 4.23 over Tyronza River?
The structure is 291 ft (88.6 m) long with a longest span of 60 ft (18.3 m) and a deck 29 ft wide.
Who owns SH 118-02-LM 4.23 over Tyronza River?
It is owned by the State Highway Agency.