SH-318/SEC-3/L9.73 over Big Creek Relief
GoodPhillips County, Arkansas · 5.89 M North of JCT SH 20 · Structure no. 000000000005713
- Built
- 1978
- 47 years old
- Condition
- Good
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 125 ft
- 3 main spans
- Daily traffic
- 530
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
SH-318/SEC-3/L9.73 over Big Creek Relief is a steel stringer/multi-beam or girder carrying SH-318/SEC-3/L9.73 over Big Creek Relief in Phillips County, Arkansas. It was built in 1978, so it is 47 years old, older than the Arkansas average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 530 vehicles a day, roughly 1% of them trucks, projected to reach 557 by 2028. The structure is 125 ft (38.1 m) long and 31 ft wide. If it were closed, the detour would be 26.7 mi (43 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH-318/SEC-3/L9.73 over Big Creek Relief built?
It was built in 1978, making it 47 years old in 2025.
What condition is SH-318/SEC-3/L9.73 over Big Creek Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does SH-318/SEC-3/L9.73 over Big Creek Relief carry?
About 530 vehicles per day (2018 count), of which roughly 1% are trucks.
How long is SH-318/SEC-3/L9.73 over Big Creek Relief?
The structure is 125 ft (38.1 m) long with a longest span of 41 ft (12.5 m) and a deck 31 ft wide.
Who owns SH-318/SEC-3/L9.73 over Big Creek Relief?
It is owned by the State Highway Agency.