SH 7 S-4 Lm 7.48 over Freeo Creek Relief
FairOuachita County, Arkansas · 7.56 MI N JCT US 79 B · Structure no. 0000000000M0162
- Built
- 1956
- 69 years old
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 61 ft
- 4 main spans
- Daily traffic
- 903
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
SH 7 S-4 Lm 7.48 over Freeo Creek Relief is a wood or timber stringer/multi-beam or girder carrying SH 7 S-4 Lm 7.48 over Freeo Creek Relief in Ouachita County, Arkansas. It was built in 1956, so it is 69 years old, older than the Arkansas average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 903 vehicles a day, roughly 7% of them trucks, projected to reach 930 by 2038. The structure is 61 ft (18.6 m) long and 24 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 7 S-4 Lm 7.48 over Freeo Creek Relief built?
It was built in 1956, making it 69 years old in 2025.
What condition is SH 7 S-4 Lm 7.48 over Freeo Creek Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does SH 7 S-4 Lm 7.48 over Freeo Creek Relief carry?
About 903 vehicles per day (2018 count), of which roughly 7% are trucks.
How long is SH 7 S-4 Lm 7.48 over Freeo Creek Relief?
The structure is 61 ft (18.6 m) long with a longest span of 15 ft (4.6 m) and a deck 24 ft wide.
Who owns SH 7 S-4 Lm 7.48 over Freeo Creek Relief?
It is owned by the State Highway Agency.