SH7 NB S-3 Lm 0.65 over Smackover Relief
GoodOuachita County, Arkansas · .5 MI So JCT SH 376 · Structure no. 000000000005935
- Built
- 1985
- 40 years old
- Condition
- Good
- inspected November 2023
- Type
- Slab
- Concrete
- Length
- 105 ft
- 3 main spans
- Daily traffic
- 5,673
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
SH7 NB S-3 Lm 0.65 over Smackover Relief is a concrete slab carrying SH7 NB S-3 Lm 0.65 over Smackover Relief in Ouachita County, Arkansas. It was built in 1985, so it is 40 years old, younger than the Arkansas average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,673 vehicles a day, roughly 1% of them trucks, projected to reach 3,036 by 2028. The structure is 105 ft (32 m) long and 43 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH7 NB S-3 Lm 0.65 over Smackover Relief built?
It was built in 1985, making it 40 years old in 2025.
What condition is SH7 NB S-3 Lm 0.65 over Smackover Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does SH7 NB S-3 Lm 0.65 over Smackover Relief carry?
About 5,673 vehicles per day (2018 count), of which roughly 1% are trucks.
How long is SH7 NB S-3 Lm 0.65 over Smackover Relief?
The structure is 105 ft (32 m) long with a longest span of 35 ft (10.7 m) and a deck 43 ft wide.
Who owns SH7 NB S-3 Lm 0.65 over Smackover Relief?
It is owned by the State Highway Agency.