US-79/SEC-13/L6.58 over White River Relief
GoodMonroe County, Arkansas · 6.58MI NE Prairie CO Line · Structure no. 000000000007027
- Built
- 2012
- 13 years old
- Condition
- Good
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 1,542 ft
- 20 main spans
- Daily traffic
- 3,400
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
US-79/SEC-13/L6.58 over White River Relief is a prestressed concrete continuous stringer/multi-beam or girder carrying US-79/SEC-13/L6.58 over White River Relief in Monroe County, Arkansas. It was built in 2012, so it is 13 years old, younger than the Arkansas average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,400 vehicles a day, roughly 21% of them trucks, projected to reach 3,600 by 2038. The structure is 1,542 ft (470 m) long and 43 ft wide. If it were closed, the detour would be 41 mi (66 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US-79/SEC-13/L6.58 over White River Relief built?
It was built in 2012, making it 13 years old in 2025.
What condition is US-79/SEC-13/L6.58 over White River Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does US-79/SEC-13/L6.58 over White River Relief carry?
About 3,400 vehicles per day (2019 count), of which roughly 21% are trucks.
How long is US-79/SEC-13/L6.58 over White River Relief?
The structure is 1,542 ft (470 m) long with a longest span of 77 ft (23.5 m) and a deck 43 ft wide.
Who owns US-79/SEC-13/L6.58 over White River Relief?
It is owned by the State Highway Agency.