US 61-03- Lm 19.01 over Ditch No 30
GoodMississippi County, Arkansas · 3.18 MI SW of Pemiscot CO · Structure no. 000000000007497
- Built
- 2024
- 1 years old
- Condition
- Good
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 94 ft
- 3 main spans
- Daily traffic
- 2,600
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
US 61-03- Lm 19.01 over Ditch No 30 is a steel stringer/multi-beam or girder carrying US 61-03- Lm 19.01 over Ditch No 30 in Mississippi County, Arkansas. It was built in 2024, so it is 1 years old, younger than the Arkansas average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,600 vehicles a day, roughly 1% of them trucks, projected to reach 3,295 by 2028. The structure is 94 ft (28.7 m) long and 32 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 61-03- Lm 19.01 over Ditch No 30 built?
It was built in 2024, making it 1 years old in 2025.
What condition is US 61-03- Lm 19.01 over Ditch No 30 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does US 61-03- Lm 19.01 over Ditch No 30 carry?
About 2,600 vehicles per day (2018 count), of which roughly 1% are trucks.
How long is US 61-03- Lm 19.01 over Ditch No 30?
The structure is 94 ft (28.7 m) long with a longest span of 40 ft (12.2 m) and a deck 32 ft wide.
Who owns US 61-03- Lm 19.01 over Ditch No 30?
It is owned by the State Highway Agency.