US Bridges

U.S.67-01-18.19 over Drainage

Good

Miller County, Arkansas · 0.4 Mi. W.Of Hemp.Co.Line · Structure no. 0000000000X1047

Built
2001
24 years old
Condition
Good
inspected August 2023
Type
Culvert
Concrete
Length
33 ft
3 main spans
Daily traffic
4,300
2018 count
Owner
State
State Highway Agency

About this bridge

U.S.67-01-18.19 over Drainage is a concrete culvert carrying U.S.67-01-18.19 over Drainage in Miller County, Arkansas. It was built in 2001, so it is 24 years old, younger than the Arkansas average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,300 vehicles a day, roughly 17% of them trucks, projected to reach 3,140 by 2028. The structure is 33 ft (10.1 m) long. If it were closed, the detour would be 6.8 mi (11 km).

CarriesU.S.67-01-18.19
CrossesDrainage
Location0.4 Mi. W.Of Hemp.Co.Line
RouteU.S. Route 67
Coordinates33.6042, -93.82063
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating43 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadH 20
Structure length33 ft (10.1 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,300 (2018)
Projected traffic3,140 by 2028
Trucks17%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was U.S.67-01-18.19 over Drainage built?

It was built in 2001, making it 24 years old in 2025.

What condition is U.S.67-01-18.19 over Drainage in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does U.S.67-01-18.19 over Drainage carry?

About 4,300 vehicles per day (2018 count), of which roughly 17% are trucks.

How long is U.S.67-01-18.19 over Drainage?

The structure is 33 ft (10.1 m) long with a longest span of 10 ft (3 m).

Who owns U.S.67-01-18.19 over Drainage?

It is owned by the State Highway Agency.