SH38-US67N on Ramp over Fourmile Creek
GoodLonoke County, Arkansas · 0.18M to HWY38 · Structure no. 000000000007402
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 272 ft
- 5 main spans
- Daily traffic
- 2,500
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
SH38-US67N on Ramp over Fourmile Creek is a steel continuous stringer/multi-beam or girder carrying SH38-US67N on Ramp over Fourmile Creek in Lonoke County, Arkansas. It was built in 2018, so it is 7 years old, younger than the Arkansas average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,500 vehicles a day, roughly 11% of them trucks, projected to reach 3,000 by 2040. The structure is 272 ft (82.9 m) long and 28 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH38-US67N on Ramp over Fourmile Creek built?
It was built in 2018, making it 7 years old in 2025.
What condition is SH38-US67N on Ramp over Fourmile Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does SH38-US67N on Ramp over Fourmile Creek carry?
About 2,500 vehicles per day (2020 count), of which roughly 11% are trucks.
How long is SH38-US67N on Ramp over Fourmile Creek?
The structure is 272 ft (82.9 m) long with a longest span of 60 ft (18.3 m) and a deck 28 ft wide.
Who owns SH38-US67N on Ramp over Fourmile Creek?
It is owned by the State Highway Agency.