- Built
- 1964
- 61 years old, rebuilt 2003
- Condition
- Fair
- inspected March 2022
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 712 ft
- 9 main spans
- Daily traffic
- 13,000
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
I 40-SEC 21-WB LN over Pvt RD Big Piney Creek is a steel stringer/multi-beam or girder carrying I 40-SEC 21-WB LN over Pvt RD Big Piney Creek in Johnson County, Arkansas. It was built in 1964 and reconstructed in 2003, so it is 61 years old, older than the Arkansas average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 13,000 vehicles a day, roughly 38% of them trucks, projected to reach 14,717 by 2028. The structure is 712 ft (217 m) long and 43 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 40-SEC 21-WB LN over Pvt RD Big Piney Creek built?
It was built in 1964, making it 61 years old in 2025. It was reconstructed in 2003.
What condition is I 40-SEC 21-WB LN over Pvt RD Big Piney Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2022.
How much traffic does I 40-SEC 21-WB LN over Pvt RD Big Piney Creek carry?
About 13,000 vehicles per day (2018 count), of which roughly 38% are trucks.
How long is I 40-SEC 21-WB LN over Pvt RD Big Piney Creek?
The structure is 712 ft (217 m) long with a longest span of 100 ft (30.5 m) and a deck 43 ft wide.
Who owns I 40-SEC 21-WB LN over Pvt RD Big Piney Creek?
It is owned by the State Highway Agency.