US Bridges

C0 8/MISSION DR over Lefever Creek

Good

Howard County, Arkansas · 0.6 M E JCT SH 355 · Structure no. 000000000004750

Built
1995
30 years old
Condition
Good
inspected April 2024
Type
Slab
Concrete
Length
150 ft
5 main spans
Daily traffic
457
2018 count
Owner
County
County Highway Agency

About this bridge

C0 8/MISSION DR over Lefever Creek is a concrete slab carrying C0 8/MISSION DR over Lefever Creek in Howard County, Arkansas. It was built in 1995, so it is 30 years old, younger than the Arkansas average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 457 vehicles a day, roughly 1% of them trucks, projected to reach 579 by 2014. The structure is 150 ft (45.7 m) long and 31 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesC0 8/MISSION DR
CrossesLefever Creek
Location0.6 M E JCT SH 355
RouteCounty Highway 8
Coordinates33.91548, -93.926
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20
Structure length150 ft (45.7 m)
Longest span30 ft (9.1 m)
Deck width31 ft (9.4 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic457 (2018)
Projected traffic579 by 2014
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was C0 8/MISSION DR over Lefever Creek built?

It was built in 1995, making it 30 years old in 2025.

What condition is C0 8/MISSION DR over Lefever Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does C0 8/MISSION DR over Lefever Creek carry?

About 457 vehicles per day (2018 count), of which roughly 1% are trucks.

How long is C0 8/MISSION DR over Lefever Creek?

The structure is 150 ft (45.7 m) long with a longest span of 30 ft (9.1 m) and a deck 31 ft wide.

Who owns C0 8/MISSION DR over Lefever Creek?

It is owned by the County Highway Agency.