US Bridges

22nd St- B over Ditch

Good

Greene County, Arkansas · JCT No 22nd & Bard RD · Structure no. 000000000021999

Built
1997
28 years old
Condition
Good
inspected August 2024
Type
Channel Beam
Concrete
Length
31 ft
1 main span
Daily traffic
152
2018 count
Owner
City
City or Municipal Highway Agency

About this bridge

22nd St- B over Ditch is a concrete channel beam carrying 22nd St- B over Ditch in Greene County, Arkansas. It was built in 1997, so it is 28 years old, younger than the Arkansas average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 152 vehicles a day, roughly 1% of them trucks, projected to reach 669 by 2017. The structure is 31 ft (9.5 m) long and 38 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

Carries22nd St- B
CrossesDitch
LocationJCT No 22nd & Bard RD
RouteCity Street 64740
Coordinates36.06715, -90.45776
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating50 US tons
Inventory rating30 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length31 ft (9.5 m)
Longest span28 ft (8.5 m)
Deck width38 ft (11.6 m)
Roadway width35 ft (10.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic152 (2018)
Projected traffic669 by 2017
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 22nd St- B over Ditch built?

It was built in 1997, making it 28 years old in 2025.

What condition is 22nd St- B over Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does 22nd St- B over Ditch carry?

About 152 vehicles per day (2018 count), of which roughly 1% are trucks.

How long is 22nd St- B over Ditch?

The structure is 31 ft (9.5 m) long with a longest span of 28 ft (8.5 m) and a deck 38 ft wide.

Who owns 22nd St- B over Ditch?

It is owned by the City or Municipal Highway Agency.