US Bridges

SH 291-01 Lm 0.65 over Moores Slough Tributary

Good

Grant County, Arkansas · 0.65 MI N SH 46-PRATTSVIL · Structure no. 0000000000X1333

Built
2016
9 years old
Condition
Good
inspected March 2023
Type
Culvert
Concrete
Length
38 ft
3 main spans
Daily traffic
320
2018 count
Owner
State
State Highway Agency

About this bridge

SH 291-01 Lm 0.65 over Moores Slough Tributary is a concrete culvert carrying SH 291-01 Lm 0.65 over Moores Slough Tributary in Grant County, Arkansas. It was built in 2016, so it is 9 years old, younger than the Arkansas average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 320 vehicles a day, roughly 9% of them trucks, projected to reach 500 by 2035. The structure is 38 ft (11.7 m) long. If it were closed, the detour would be 3.7 mi (6 km).

CarriesSH 291-01 Lm 0.65
CrossesMoores Slough Tributary
Location0.65 MI N SH 46-PRATTSVIL
RouteState Highway 291
Coordinates34.23965, -92.53978
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert8 Very GoodNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating57 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHL 93
Structure length38 ft (11.7 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic320 (2018)
Projected traffic500 by 2035
Trucks9%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 291-01 Lm 0.65 over Moores Slough Tributary built?

It was built in 2016, making it 9 years old in 2025.

What condition is SH 291-01 Lm 0.65 over Moores Slough Tributary in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does SH 291-01 Lm 0.65 over Moores Slough Tributary carry?

About 320 vehicles per day (2018 count), of which roughly 9% are trucks.

How long is SH 291-01 Lm 0.65 over Moores Slough Tributary?

The structure is 38 ft (11.7 m) long with a longest span of 12 ft (3.7 m).

Who owns SH 291-01 Lm 0.65 over Moores Slough Tributary?

It is owned by the State Highway Agency.