CR129E Tena Herron over Cedar Fourche Creek
GoodPosted for loadGarland County, Arkansas · .6 MI N SH 298 · Structure no. 000000000024182
- Built
- 2020
- 5 years old
- Condition
- Good
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 22 ft
- 2 main spans
- Daily traffic
- 87
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
CR129E Tena Herron over Cedar Fourche Creek is a steel continuous stringer/multi-beam or girder carrying CR129E Tena Herron over Cedar Fourche Creek in Garland County, Arkansas. It was built in 2020, so it is 5 years old, younger than the Arkansas average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 87 vehicles a day, roughly 1% of them trucks, projected to reach 66 by 2027. The structure is 22 ft (6.6 m) long and 14 ft wide. If it were closed, the detour would be 100 mi (161 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR129E Tena Herron over Cedar Fourche Creek built?
It was built in 2020, making it 5 years old in 2025.
What condition is CR129E Tena Herron over Cedar Fourche Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does CR129E Tena Herron over Cedar Fourche Creek carry?
About 87 vehicles per day (2018 count), of which roughly 1% are trucks.
How long is CR129E Tena Herron over Cedar Fourche Creek?
The structure is 22 ft (6.6 m) long with a longest span of 12 ft (3.7 m) and a deck 14 ft wide.
Who owns CR129E Tena Herron over Cedar Fourche Creek?
It is owned by the County Highway Agency.