South Harris Rd. over S Fork Little Mazarn CR
GoodGarland County, Arkansas · 1.43 M N Cords 63 & 64 · Structure no. 000000000004946
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected February 2025
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 172 ft
- 3 main spans
- Daily traffic
- 1,100
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
South Harris Rd. over S Fork Little Mazarn CR is a steel continuous stringer/multi-beam or girder carrying South Harris Rd. over S Fork Little Mazarn CR in Garland County, Arkansas. It was built in 2023, so it is 2 years old, younger than the Arkansas average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,100 vehicles a day, roughly 4% of them trucks, projected to reach 1,320 by 2038. The structure is 172 ft (52.3 m) long and 31 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was South Harris Rd. over S Fork Little Mazarn CR built?
It was built in 2023, making it 2 years old in 2025.
What condition is South Harris Rd. over S Fork Little Mazarn CR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.
How much traffic does South Harris Rd. over S Fork Little Mazarn CR carry?
About 1,100 vehicles per day (2018 count), of which roughly 4% are trucks.
How long is South Harris Rd. over S Fork Little Mazarn CR?
The structure is 172 ft (52.3 m) long with a longest span of 65 ft (19.8 m) and a deck 31 ft wide.
Who owns South Harris Rd. over S Fork Little Mazarn CR?
It is owned by the County Highway Agency.