North Culberhouse over Lost Creek Ditch
FairCraighead County, Arkansas · 100 S. JCT Woodrow St. · Structure no. 000000000021362
- Built
- 1993
- 32 years old
- Condition
- Fair
- inspected March 2023
- Type
- Channel Beam
- Concrete
- Length
- 90 ft
- 3 main spans
- Daily traffic
- 3,400
- 2018 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
North Culberhouse over Lost Creek Ditch is a concrete channel beam carrying North Culberhouse over Lost Creek Ditch in Craighead County, Arkansas. It was built in 1993, so it is 32 years old, younger than the Arkansas average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,400 vehicles a day, roughly 4% of them trucks, projected to reach 4,200 by 2038. The structure is 90 ft (27.4 m) long and 31 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was North Culberhouse over Lost Creek Ditch built?
It was built in 1993, making it 32 years old in 2025.
What condition is North Culberhouse over Lost Creek Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does North Culberhouse over Lost Creek Ditch carry?
About 3,400 vehicles per day (2018 count), of which roughly 4% are trucks.
How long is North Culberhouse over Lost Creek Ditch?
The structure is 90 ft (27.4 m) long with a longest span of 30 ft (9.1 m) and a deck 31 ft wide.
Who owns North Culberhouse over Lost Creek Ditch?
It is owned by the City or Municipal Highway Agency.