US Bridges

SH 18-04 Lm 17.34 over St. Francis River Relief

Good

Craighead County, Arkansas · .91 M E St. Francis River · Structure no. 000000000007179

Built
2012
13 years old
Condition
Good
inspected September 2023
Type
Tee Beam
Concrete
Length
90 ft
3 main spans
Daily traffic
8,100
2018 count
Owner
State
State Highway Agency

About this bridge

SH 18-04 Lm 17.34 over St. Francis River Relief is a concrete tee beam carrying SH 18-04 Lm 17.34 over St. Francis River Relief in Craighead County, Arkansas. It was built in 2012, so it is 13 years old, younger than the Arkansas average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,100 vehicles a day, roughly 11% of them trucks, projected to reach 8,000 by 2030. The structure is 90 ft (27.4 m) long and 78 ft wide. If it were closed, the detour would be 39.8 mi (64 km).

CarriesSH 18-04 Lm 17.34
CrossesSt. Francis River Relief
Location.91 M E St. Francis River
RouteState Highway 18
Coordinates35.82939, -90.42097
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating34 US tons
Inventory rating27 US tons

Structure

Structure typeTee Beam
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length90 ft (27.4 m)
Longest span30 ft (9.1 m)
Deck width78 ft (23.8 m)
Roadway width75 ft (22.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,100 (2018)
Projected traffic8,000 by 2030
Trucks11%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed39.8 mi (64 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 18-04 Lm 17.34 over St. Francis River Relief built?

It was built in 2012, making it 13 years old in 2025.

What condition is SH 18-04 Lm 17.34 over St. Francis River Relief in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does SH 18-04 Lm 17.34 over St. Francis River Relief carry?

About 8,100 vehicles per day (2018 count), of which roughly 11% are trucks.

How long is SH 18-04 Lm 17.34 over St. Francis River Relief?

The structure is 90 ft (27.4 m) long with a longest span of 30 ft (9.1 m) and a deck 78 ft wide.

Who owns SH 18-04 Lm 17.34 over St. Francis River Relief?

It is owned by the State Highway Agency.