US79 S-1 Lm 11.44 over Horsehead Relief
FairColumbia County, Arkansas · 6.0 MI S of Magnolia · Structure no. 0000000000M1444
- Built
- 1928
- 97 years old
- Condition
- Fair
- inspected January 2024
- Type
- Culvert
- Concrete
- Length
- 22 ft
- 2 main spans
- Daily traffic
- 2,700
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
US79 S-1 Lm 11.44 over Horsehead Relief is a concrete culvert carrying US79 S-1 Lm 11.44 over Horsehead Relief in Columbia County, Arkansas. It was built in 1928, so it is 97 years old, older than the Arkansas average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,700 vehicles a day, roughly 12% of them trucks, projected to reach 3,604 by 2027. The structure is 22 ft (6.6 m) long and 49 ft wide. If it were closed, the detour would be 8.7 mi (14 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 7 Good | Some minor problems. |
| Culvert | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US79 S-1 Lm 11.44 over Horsehead Relief built?
It was built in 1928, making it 97 years old in 2025.
What condition is US79 S-1 Lm 11.44 over Horsehead Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does US79 S-1 Lm 11.44 over Horsehead Relief carry?
About 2,700 vehicles per day (2018 count), of which roughly 12% are trucks.
How long is US79 S-1 Lm 11.44 over Horsehead Relief?
The structure is 22 ft (6.6 m) long with a longest span of 10 ft (3 m) and a deck 49 ft wide.
Who owns US79 S-1 Lm 11.44 over Horsehead Relief?
It is owned by the State Highway Agency.