SH 211-01- Lm 3.21 over Main Ditch
FairClay County, Arkansas · 1 MI N of Success · Structure no. 000000000003421
- Built
- 1961
- 64 years old
- Condition
- Fair
- inspected December 2023
- Type
- Slab
- Concrete
- Length
- 120 ft
- 4 main spans
- Daily traffic
- 550
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
SH 211-01- Lm 3.21 over Main Ditch is a concrete slab carrying SH 211-01- Lm 3.21 over Main Ditch in Clay County, Arkansas. It was built in 1961, so it is 64 years old, older than the Arkansas average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 550 vehicles a day, roughly 1% of them trucks, projected to reach 591 by 2028. The structure is 120 ft (36.6 m) long and 29 ft wide. If it were closed, the detour would be 14.3 mi (23 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 211-01- Lm 3.21 over Main Ditch built?
It was built in 1961, making it 64 years old in 2025.
What condition is SH 211-01- Lm 3.21 over Main Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does SH 211-01- Lm 3.21 over Main Ditch carry?
About 550 vehicles per day (2018 count), of which roughly 1% are trucks.
How long is SH 211-01- Lm 3.21 over Main Ditch?
The structure is 120 ft (36.6 m) long with a longest span of 30 ft (9.1 m) and a deck 29 ft wide.
Who owns SH 211-01- Lm 3.21 over Main Ditch?
It is owned by the State Highway Agency.