SH 7 S-6 Lm 6.53 over Leau Frais Relief
FairClark County, Arkansas · 4.71 MI SE JCT SH 51 · Structure no. 0000000000M0178
- Built
- 1957
- 68 years old
- Condition
- Fair
- inspected March 2023
- Type
- Channel Beam
- Concrete
- Length
- 209 ft
- 11 main spans
- Daily traffic
- 1,700
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
SH 7 S-6 Lm 6.53 over Leau Frais Relief is a concrete channel beam carrying SH 7 S-6 Lm 6.53 over Leau Frais Relief in Clark County, Arkansas. It was built in 1957, so it is 68 years old, older than the Arkansas average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,700 vehicles a day, roughly 1% of them trucks, projected to reach 1,810 by 2028. The structure is 209 ft (63.7 m) long and 25 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 7 S-6 Lm 6.53 over Leau Frais Relief built?
It was built in 1957, making it 68 years old in 2025.
What condition is SH 7 S-6 Lm 6.53 over Leau Frais Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does SH 7 S-6 Lm 6.53 over Leau Frais Relief carry?
About 1,700 vehicles per day (2018 count), of which roughly 1% are trucks.
How long is SH 7 S-6 Lm 6.53 over Leau Frais Relief?
The structure is 209 ft (63.7 m) long with a longest span of 19 ft (5.8 m) and a deck 25 ft wide.
Who owns SH 7 S-6 Lm 6.53 over Leau Frais Relief?
It is owned by the State Highway Agency.