I-30EB S14 LM69.80 over Big Deciper Creek
FairClark County, Arkansas · .53 MI E JCT SH 26 · Structure no. 0000000000B3689
- Built
- 1965
- 60 years old, rebuilt 1999
- Condition
- Fair
- inspected October 2023
- Type
- Slab
- Concrete
- Length
- 100 ft
- 4 main spans
- Daily traffic
- 14,482
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
I-30EB S14 LM69.80 over Big Deciper Creek is a concrete slab carrying I-30EB S14 LM69.80 over Big Deciper Creek in Clark County, Arkansas. It was built in 1965 and reconstructed in 1999, so it is 60 years old, older than the Arkansas average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 14,482 vehicles a day, roughly 54% of them trucks, projected to reach 38,000 by 2038. The structure is 100 ft (30.5 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-30EB S14 LM69.80 over Big Deciper Creek built?
It was built in 1965, making it 60 years old in 2025. It was reconstructed in 1999.
What condition is I-30EB S14 LM69.80 over Big Deciper Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does I-30EB S14 LM69.80 over Big Deciper Creek carry?
About 14,482 vehicles per day (2018 count), of which roughly 54% are trucks.
How long is I-30EB S14 LM69.80 over Big Deciper Creek?
The structure is 100 ft (30.5 m) long with a longest span of 25 ft (7.6 m) and a deck 43 ft wide.
Who owns I-30EB S14 LM69.80 over Big Deciper Creek?
It is owned by the State Highway Agency.