SH51SEC1KINGOP over I 30 Sec. 14 Log 72.86
GoodClark County, Arkansas · 2.25 Mi. W JCT US 67 · Structure no. 000000000006962
- Built
- 2004
- 21 years old
- Condition
- Good
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 309 ft
- 4 main spans
- Daily traffic
- 10,264
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
SH51SEC1KINGOP over I 30 Sec. 14 Log 72.86 is a steel continuous stringer/multi-beam or girder carrying SH51SEC1KINGOP over I 30 Sec. 14 Log 72.86 in Clark County, Arkansas. It was built in 2004, so it is 21 years old, younger than the Arkansas average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 10,264 vehicles a day, roughly 3% of them trucks, projected to reach 19,669 by 2027. The structure is 309 ft (94.2 m) long and 73 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH51SEC1KINGOP over I 30 Sec. 14 Log 72.86 built?
It was built in 2004, making it 21 years old in 2025.
What condition is SH51SEC1KINGOP over I 30 Sec. 14 Log 72.86 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does SH51SEC1KINGOP over I 30 Sec. 14 Log 72.86 carry?
About 10,264 vehicles per day (2018 count), of which roughly 3% are trucks.
How long is SH51SEC1KINGOP over I 30 Sec. 14 Log 72.86?
The structure is 309 ft (94.2 m) long with a longest span of 104 ft (31.7 m) and a deck 73 ft wide.
Who owns SH51SEC1KINGOP over I 30 Sec. 14 Log 72.86?
It is owned by the State Highway Agency.