SH 203 S-1 Lm 2.42 over Clear Pond
FairCalhoun County, Arkansas · 2.5 MI NW JCT SH 4 & 203 · Structure no. 0000000000M2316
- Built
- 1965
- 60 years old
- Condition
- Fair
- inspected August 2024
- Type
- Channel Beam
- Concrete
- Length
- 57 ft
- 3 main spans
- Daily traffic
- 790
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
SH 203 S-1 Lm 2.42 over Clear Pond is a concrete channel beam carrying SH 203 S-1 Lm 2.42 over Clear Pond in Calhoun County, Arkansas. It was built in 1965, so it is 60 years old, older than the Arkansas average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 790 vehicles a day, roughly 1% of them trucks, projected to reach 836 by 2028. The structure is 57 ft (17.4 m) long and 26 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 203 S-1 Lm 2.42 over Clear Pond built?
It was built in 1965, making it 60 years old in 2025.
What condition is SH 203 S-1 Lm 2.42 over Clear Pond in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does SH 203 S-1 Lm 2.42 over Clear Pond carry?
About 790 vehicles per day (2018 count), of which roughly 1% are trucks.
How long is SH 203 S-1 Lm 2.42 over Clear Pond?
The structure is 57 ft (17.4 m) long with a longest span of 19 ft (5.8 m) and a deck 26 ft wide.
Who owns SH 203 S-1 Lm 2.42 over Clear Pond?
It is owned by the State Highway Agency.