Ar HWY 7 over West Fork Crooked Creek
GoodBoone County, Arkansas · 3.62 Miles South of Jct. · Structure no. 000000000007543
- Built
- 2022
- 3 years old
- Condition
- Good
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 227 ft
- 3 main spans
- Daily traffic
- 4,700
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Ar HWY 7 over West Fork Crooked Creek is a steel continuous stringer/multi-beam or girder carrying Ar HWY 7 over West Fork Crooked Creek in Boone County, Arkansas. It was built in 2022, so it is 3 years old, younger than the Arkansas average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,700 vehicles a day, roughly 3% of them trucks, projected to reach 5,300 by 2042. The structure is 227 ft (69.3 m) long and 44 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ar HWY 7 over West Fork Crooked Creek built?
It was built in 2022, making it 3 years old in 2025.
What condition is Ar HWY 7 over West Fork Crooked Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does Ar HWY 7 over West Fork Crooked Creek carry?
About 4,700 vehicles per day (2022 count), of which roughly 3% are trucks.
How long is Ar HWY 7 over West Fork Crooked Creek?
The structure is 227 ft (69.3 m) long with a longest span of 87 ft (26.5 m) and a deck 44 ft wide.
Who owns Ar HWY 7 over West Fork Crooked Creek?
It is owned by the State Highway Agency.