US Bridges

SH94/BIBLE Camp RD over Ditch (side Drain)

Good

Benton County, Arkansas · 1.0 MI W Monte NE · Structure no. 0000000000X1522

Built
2018
7 years old
Condition
Good
inspected August 2024
Type
Culvert
Concrete
Length
23 ft
2 main spans
Daily traffic
3,100
2018 count
Owner
State
State Highway Agency

About this bridge

SH94/BIBLE Camp RD over Ditch (side Drain) is a concrete culvert carrying SH94/BIBLE Camp RD over Ditch (side Drain) in Benton County, Arkansas. It was built in 2018, so it is 7 years old, younger than the Arkansas average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,100 vehicles a day, roughly 1% of them trucks, projected to reach 30 by 2038. The structure is 23 ft (6.9 m) long and 18 ft wide. If it were closed, the detour would be 100 mi (161 km).

CarriesSH94/BIBLE Camp RD
CrossesDitch (side Drain)
Location1.0 MI W Monte NE
RouteState Highway 94
Coordinates36.29566, -94.08534
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating53 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadUnknown
Structure length23 ft (6.9 m)
Longest span10 ft (3 m)
Deck width18 ft (5.6 m)
Roadway width17 ft (5.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,100 (2018)
Projected traffic30 by 2038
Trucks1%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed100 mi (161 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SH94/BIBLE Camp RD over Ditch (side Drain) built?

It was built in 2018, making it 7 years old in 2025.

What condition is SH94/BIBLE Camp RD over Ditch (side Drain) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does SH94/BIBLE Camp RD over Ditch (side Drain) carry?

About 3,100 vehicles per day (2018 count), of which roughly 1% are trucks.

How long is SH94/BIBLE Camp RD over Ditch (side Drain)?

The structure is 23 ft (6.9 m) long with a longest span of 10 ft (3 m) and a deck 18 ft wide.

Who owns SH94/BIBLE Camp RD over Ditch (side Drain)?

It is owned by the State Highway Agency.