US Bridges

S.Springs Maple ST over Sager Creek

Good

Benton County, Arkansas · 0.01 M N JCT W University · Structure no. 000000000023524

Built
2011
14 years old
Condition
Good
inspected October 2023
Type
Arch - Deck
Concrete
Length
64 ft
4 main spans
Daily traffic
60
2018 count
Owner
City
City or Municipal Highway Agency

About this bridge

S.Springs Maple ST over Sager Creek is a concrete arch - deck carrying S.Springs Maple ST over Sager Creek in Benton County, Arkansas. It was built in 2011, so it is 14 years old, younger than the Arkansas average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 60 vehicles a day, roughly 1% of them trucks, projected to reach 150 by 2031. The structure is 64 ft (19.5 m) long and 23 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesS.Springs Maple ST
CrossesSager Creek
Location0.01 M N JCT W University
RouteCity Street 35820
Coordinates36.18642, -94.5445
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating31 US tons
Inventory rating19 US tons

Structure

Structure typeArch - Deck
MaterialConcrete
DeckConcrete, cast-in-place
Main spans4
Design loadUnknown
Structure length64 ft (19.5 m)
Longest span16 ft (4.9 m)
Deck width23 ft (7.1 m)
Roadway width11 ft (3.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic60 (2018)
Projected traffic150 by 2031
Trucks1%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was S.Springs Maple ST over Sager Creek built?

It was built in 2011, making it 14 years old in 2025.

What condition is S.Springs Maple ST over Sager Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does S.Springs Maple ST over Sager Creek carry?

About 60 vehicles per day (2018 count), of which roughly 1% are trucks.

How long is S.Springs Maple ST over Sager Creek?

The structure is 64 ft (19.5 m) long with a longest span of 16 ft (4.9 m) and a deck 23 ft wide.

Who owns S.Springs Maple ST over Sager Creek?

It is owned by the City or Municipal Highway Agency.