CR210/MT Moriah DR over Breastwork Creek Relief
PoorPosted for loadWilcox County, Alabama · 2.6 Miles East CR7 · Structure no. 011704
- Built
- 1976
- 49 years old
- Condition
- Poor
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 37 ft
- 2 main spans
- Daily traffic
- 20
- 2016 count
- Owner
- County
- County Highway Agency
About this bridge
CR210/MT Moriah DR over Breastwork Creek Relief is a wood or timber stringer/multi-beam or girder carrying CR210/MT Moriah DR over Breastwork Creek Relief in Wilcox County, Alabama. It was built in 1976, so it is 49 years old, younger than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.
It carries about 20 vehicles a day, projected to reach 20 by 2036. The structure is 37 ft (11.3 m) long and 16 ft wide. If it were closed, the detour would be 11.2 mi (18 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR210/MT Moriah DR over Breastwork Creek Relief built?
It was built in 1976, making it 49 years old in 2025.
What condition is CR210/MT Moriah DR over Breastwork Creek Relief in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in November 2024.
How much traffic does CR210/MT Moriah DR over Breastwork Creek Relief carry?
About 20 vehicles per day (2016 count).
How long is CR210/MT Moriah DR over Breastwork Creek Relief?
The structure is 37 ft (11.3 m) long with a longest span of 21 ft (6.5 m) and a deck 16 ft wide.
Who owns CR210/MT Moriah DR over Breastwork Creek Relief?
It is owned by the County Highway Agency.