35th Street over Trib. to Moody Swamp
FairTuscaloosa County, Alabama · 0.5 MI W Kauloosa Ave · Structure no. 016185
- Built
- 1995
- 30 years old
- Condition
- Fair
- inspected November 2024
- Type
- Channel Beam
- Concrete
- Length
- 34 ft
- 1 main span
- Daily traffic
- 7,320
- 2001 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
35th Street over Trib. to Moody Swamp is a concrete channel beam carrying 35th Street over Trib. to Moody Swamp in Tuscaloosa County, Alabama. It was built in 1995, so it is 30 years old, younger than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 7,320 vehicles a day, roughly 3% of them trucks, projected to reach 11,895 by 2032. The structure is 34 ft (10.4 m) long and 45 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 35th Street over Trib. to Moody Swamp built?
It was built in 1995, making it 30 years old in 2025.
What condition is 35th Street over Trib. to Moody Swamp in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does 35th Street over Trib. to Moody Swamp carry?
About 7,320 vehicles per day (2001 count), of which roughly 3% are trucks.
How long is 35th Street over Trib. to Moody Swamp?
The structure is 34 ft (10.4 m) long with a longest span of 34 ft (10.4 m) and a deck 45 ft wide.
Who owns 35th Street over Trib. to Moody Swamp?
It is owned by the City or Municipal Highway Agency.