US Bridges

County Road 303 over Talladega Creek

Good

Talladega County, Alabama · At Int.W/Taylor"s Mill RD · Structure no. 018854

Built
2004
21 years old
Condition
Good
inspected December 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
240 ft
3 main spans
Daily traffic
695
2018 count
Owner
County
County Highway Agency

About this bridge

County Road 303 over Talladega Creek is a prestressed concrete stringer/multi-beam or girder carrying County Road 303 over Talladega Creek in Talladega County, Alabama. It was built in 2004, so it is 21 years old, younger than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 695 vehicles a day, roughly 12% of them trucks, projected to reach 1,128 by 2038. The structure is 240 ft (73.2 m) long and 31 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesCounty Road 303
CrossesTalladega Creek
LocationAt Int.W/Taylor"s Mill RD
RouteCounty Highway 303
StateAlabama
Coordinates33.38667, -86.08
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating83 US tons
Inventory rating53.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3 (+2 approach)
Design loadHS 20
Structure length240 ft (73.2 m)
Longest span80 ft (24.4 m)
Deck width31 ft (9.4 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic695 (2018)
Projected traffic1,128 by 2038
Trucks12%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollToll bridge segment under Secretarial agreement
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$1.9 million (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was County Road 303 over Talladega Creek built?

It was built in 2004, making it 21 years old in 2025.

What condition is County Road 303 over Talladega Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does County Road 303 over Talladega Creek carry?

About 695 vehicles per day (2018 count), of which roughly 12% are trucks.

How long is County Road 303 over Talladega Creek?

The structure is 240 ft (73.2 m) long with a longest span of 80 ft (24.4 m) and a deck 31 ft wide.

Who owns County Road 303 over Talladega Creek?

It is owned by the County Highway Agency.