US Bridges

AL235 over Norfolk Southern R/R

Good

Talladega County, Alabama · .2 Mi.North Inter.Us 280 · Structure no. 018423

Built
2008
17 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
255 ft
3 main spans
Daily traffic
5,696
2023 count
Owner
State
State Highway Agency

About this bridge

AL235 over Norfolk Southern R/R is a prestressed concrete stringer/multi-beam or girder carrying AL235 over Norfolk Southern R/R in Talladega County, Alabama. It was built in 2008, so it is 17 years old, younger than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,696 vehicles a day, roughly 10% of them trucks, projected to reach 7,974 by 2043. The structure is 255 ft (77.7 m) long and 67 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesAL235
CrossesNorfolk Southern R/R
Location.2 Mi.North Inter.Us 280
RouteState Highway 235
StateAlabama
Coordinates33.28594, -86.3605
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating90.2 US tons
Inventory rating43.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length255 ft (77.7 m)
Longest span105 ft (32 m)
Deck width67 ft (20.3 m)
Roadway width64 ft (19.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,696 (2023)
Projected traffic7,974 by 2043
Trucks10%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesRailroad
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$4.4 million (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was AL235 over Norfolk Southern R/R built?

It was built in 2008, making it 17 years old in 2025.

What condition is AL235 over Norfolk Southern R/R in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does AL235 over Norfolk Southern R/R carry?

About 5,696 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is AL235 over Norfolk Southern R/R?

The structure is 255 ft (77.7 m) long with a longest span of 105 ft (32 m) and a deck 67 ft wide.

Who owns AL235 over Norfolk Southern R/R?

It is owned by the State Highway Agency.