US Bridges

Roadway over CO Rt 1202 Stream

Good

Sumter County, Alabama · 3.0 MI E Rosser · Structure no. 006728

Built
1959
66 years old
Condition
Good
inspected September 2024
Type
Culvert
Concrete
Length
25 ft
2 main spans
Daily traffic
115
2022 count
Owner
County
County Highway Agency

About this bridge

Roadway over CO Rt 1202 Stream is a concrete culvert carrying Roadway over CO Rt 1202 Stream in Sumter County, Alabama. It was built in 1959, so it is 66 years old, older than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 115 vehicles a day, roughly 5% of them trucks, projected to reach 269 by 2039. The structure is 25 ft (7.5 m) long. If it were closed, the detour would be 8.7 mi (14 km).

CarriesRoadway
CrossesCO Rt 1202 Stream
Location3.0 MI E Rosser
RouteCounty Highway 1202
StateAlabama
Coordinates32.325, -88.325
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating71.4 US tons
Inventory rating42.8 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadH 15
Structure length25 ft (7.5 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic115 (2022)
Projected traffic269 by 2039
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.7 mi (14 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$267,000 (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Roadway over CO Rt 1202 Stream built?

It was built in 1959, making it 66 years old in 2025.

What condition is Roadway over CO Rt 1202 Stream in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Roadway over CO Rt 1202 Stream carry?

About 115 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is Roadway over CO Rt 1202 Stream?

The structure is 25 ft (7.5 m) long with a longest span of 12 ft (3.7 m).

Who owns Roadway over CO Rt 1202 Stream?

It is owned by the County Highway Agency.