Sweet Gum Drive over No. Fork Yellowleaf Ck
GoodShelby County, Alabama · 0.44 Mi. North CR 39 · Structure no. 016859
- Built
- 1996
- 29 years old
- Condition
- Good
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 64 ft
- 1 main span
- Daily traffic
- 178
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Sweet Gum Drive over No. Fork Yellowleaf Ck is a prestressed concrete stringer/multi-beam or girder carrying Sweet Gum Drive over No. Fork Yellowleaf Ck in Shelby County, Alabama. It was built in 1996, so it is 29 years old, younger than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 178 vehicles a day, projected to reach 238 by 2043. The structure is 64 ft (19.5 m) long and 32 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sweet Gum Drive over No. Fork Yellowleaf Ck built?
It was built in 1996, making it 29 years old in 2025.
What condition is Sweet Gum Drive over No. Fork Yellowleaf Ck in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does Sweet Gum Drive over No. Fork Yellowleaf Ck carry?
About 178 vehicles per day (2023 count).
How long is Sweet Gum Drive over No. Fork Yellowleaf Ck?
The structure is 64 ft (19.5 m) long with a longest span of 61 ft (18.7 m) and a deck 32 ft wide.
Who owns Sweet Gum Drive over No. Fork Yellowleaf Ck?
It is owned by the County Highway Agency.