US Bridges

US 78 over Cane Creek

Good

St. Clair County, Alabama · .2 Mile E Cook Springs RD · Structure no. 019870

Built
2014
11 years old
Condition
Good
inspected June 2024
Type
Culvert
Concrete
Length
125 ft
6 main spans
Daily traffic
1,071
2024 count
Owner
State
State Highway Agency

About this bridge

US 78 over Cane Creek is a concrete culvert carrying US 78 over Cane Creek in St. Clair County, Alabama. It was built in 2014, so it is 11 years old, younger than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,071 vehicles a day, roughly 5% of them trucks, projected to reach 1,760 by 2044. The structure is 125 ft (38.1 m) long and 44 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesUS 78
CrossesCane Creek
Location.2 Mile E Cook Springs RD
RouteU.S. Route 78
StateAlabama
Coordinates33.59072, -86.39295
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating98 US tons
Inventory rating94.2 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans6
Design loadHS 20
Structure length125 ft (38.1 m)
Longest span21 ft (6.4 m)
Deck width44 ft (13.4 m)
Roadway width41 ft (12.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,071 (2024)
Projected traffic1,760 by 2044
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$2.3 million (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was US 78 over Cane Creek built?

It was built in 2014, making it 11 years old in 2025.

What condition is US 78 over Cane Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does US 78 over Cane Creek carry?

About 1,071 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is US 78 over Cane Creek?

The structure is 125 ft (38.1 m) long with a longest span of 21 ft (6.4 m) and a deck 44 ft wide.

Who owns US 78 over Cane Creek?

It is owned by the State Highway Agency.