US Bridges

St. Clair Road over Relief Ditch

Good

St. Clair County, Alabama · 1.8 Miles West US 411 · Structure no. 019735

Built
1983
42 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
101 ft
3 main spans
Daily traffic
1,200
2006 count
Owner
County
County Highway Agency

About this bridge

St. Clair Road over Relief Ditch is a prestressed concrete continuous stringer/multi-beam or girder carrying St. Clair Road over Relief Ditch in St. Clair County, Alabama. It was built in 1983, so it is 42 years old, younger than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,200 vehicles a day, roughly 5% of them trucks, projected to reach 1,600 by 2030. The structure is 101 ft (30.8 m) long and 39 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesSt. Clair Road
CrossesRelief Ditch
Location1.8 Miles West US 411
RouteCounty Highway 0
StateAlabama
Coordinates33.73564, -86.37844
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating65.9 US tons
Inventory rating39.5 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckOpen grating
Main spans3
Design loadHS 20
Structure length101 ft (30.8 m)
Longest span33 ft (10.2 m)
Deck width39 ft (12 m)
Roadway width34 ft (10.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,200 (2006)
Projected traffic1,600 by 2030
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$1.2 million (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was St. Clair Road over Relief Ditch built?

It was built in 1983, making it 42 years old in 2025.

What condition is St. Clair Road over Relief Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does St. Clair Road over Relief Ditch carry?

About 1,200 vehicles per day (2006 count), of which roughly 5% are trucks.

How long is St. Clair Road over Relief Ditch?

The structure is 101 ft (30.8 m) long with a longest span of 33 ft (10.2 m) and a deck 39 ft wide.

Who owns St. Clair Road over Relief Ditch?

It is owned by the County Highway Agency.