US Bridges

County Road 7761 over Trib to Mill Creek

Good

Pike County, Alabama · SEC8 T10N R22E · Structure no. 019139

Built
2004
21 years old
Condition
Good
inspected July 2024
Type
Culvert
Concrete
Length
37 ft
3 main spans
Daily traffic
70
2003 count
Owner
County
County Highway Agency

About this bridge

County Road 7761 over Trib to Mill Creek is a concrete culvert carrying County Road 7761 over Trib to Mill Creek in Pike County, Alabama. It was built in 2004, so it is 21 years old, younger than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 70 vehicles a day, projected to reach 105 by 2034. The structure is 37 ft (11.3 m) long and 26 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesCounty Road 7761
CrossesTrib to Mill Creek
LocationSEC8 T10N R22E
RouteCounty Highway 174
StateAlabama
Coordinates31.85929, -85.87504
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating72.6 US tons
Inventory rating43.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length37 ft (11.3 m)
Longest span12 ft (3.7 m)
Deck width26 ft (7.9 m)
Roadway width24 ft (7.4 m)
Vertical clearance over deck0 ft (0 m)

Traffic and service

Average daily traffic70 (2003)
Projected traffic105 by 2034
Trucks0%
Lanes on structure2
Traffic directionHighway traffic not carried
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$298,000 (2025 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was County Road 7761 over Trib to Mill Creek built?

It was built in 2004, making it 21 years old in 2025.

What condition is County Road 7761 over Trib to Mill Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does County Road 7761 over Trib to Mill Creek carry?

About 70 vehicles per day (2003 count).

How long is County Road 7761 over Trib to Mill Creek?

The structure is 37 ft (11.3 m) long with a longest span of 12 ft (3.7 m) and a deck 26 ft wide.

Who owns County Road 7761 over Trib to Mill Creek?

It is owned by the County Highway Agency.