County Road 3328 over Trib to Clearwater Creek
FairPike County, Alabama · Sec 32 T8N R22E · Structure no. 007921
- Built
- 1963
- 62 years old
- Condition
- Fair
- inspected August 2024
- Type
- Culvert
- Concrete
- Length
- 25 ft
- 3 main spans
- Daily traffic
- 300
- 2000 count
- Owner
- County
- County Highway Agency
About this bridge
County Road 3328 over Trib to Clearwater Creek is a concrete culvert carrying County Road 3328 over Trib to Clearwater Creek in Pike County, Alabama. It was built in 1963, so it is 62 years old, older than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 300 vehicles a day, roughly 5% of them trucks, projected to reach 300 by 2035. The structure is 25 ft (7.6 m) long and 52 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
| Culvert | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 3328 over Trib to Clearwater Creek built?
It was built in 1963, making it 62 years old in 2025.
What condition is County Road 3328 over Trib to Clearwater Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does County Road 3328 over Trib to Clearwater Creek carry?
About 300 vehicles per day (2000 count), of which roughly 5% are trucks.
How long is County Road 3328 over Trib to Clearwater Creek?
The structure is 25 ft (7.6 m) long with a longest span of 8 ft (2.4 m) and a deck 52 ft wide.
Who owns County Road 3328 over Trib to Clearwater Creek?
It is owned by the County Highway Agency.