County Road 7708 over Conecuh River Relief
GoodPosted for loadPike County, Alabama · Sec 04 T10N R21E · Structure no. 005137
- Built
- 1955
- 70 years old
- Condition
- Good
- inspected December 2023
- Type
- Tee Beam
- Concrete
- Length
- 272 ft
- 8 main spans
- Daily traffic
- 240
- 2001 count
- Owner
- County
- County Highway Agency
About this bridge
County Road 7708 over Conecuh River Relief is a concrete tee beam carrying County Road 7708 over Conecuh River Relief in Pike County, Alabama. It was built in 1955, so it is 70 years old, older than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 240 vehicles a day, roughly 5% of them trucks, projected to reach 300 by 2035. The structure is 272 ft (82.9 m) long and 29 ft wide. If it were closed, the detour would be 19.3 mi (31 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 7708 over Conecuh River Relief built?
It was built in 1955, making it 70 years old in 2025.
What condition is County Road 7708 over Conecuh River Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does County Road 7708 over Conecuh River Relief carry?
About 240 vehicles per day (2001 count), of which roughly 5% are trucks.
How long is County Road 7708 over Conecuh River Relief?
The structure is 272 ft (82.9 m) long with a longest span of 34 ft (10.4 m) and a deck 29 ft wide.
Who owns County Road 7708 over Conecuh River Relief?
It is owned by the County Highway Agency.