CR 57 over Holly Creek

Good

Pickens County, Alabama · 1MI. South of US#82 · Structure no. 018099

Built
2002
23 years old
Condition
Good
inspected March 2024
Type
Channel Beam
Concrete
Length
102 ft
3 main spans
Daily traffic
150
2001 count
Owner
County
County Highway Agency

About this bridge

CR 57 over Holly Creek is a concrete channel beam carrying CR 57 over Holly Creek in Pickens County, Alabama. It was built in 2002, so it is 23 years old, younger than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 150 vehicles a day, projected to reach 220 by 2034. The structure is 102 ft (31.1 m) long and 28 ft wide. If it were closed, the detour would be 11.2 mi (18 km).

CarriesCR 57
CrossesHolly Creek
Location1MI. South of US#82
RouteCounty Highway 57
StateAlabama
Coordinates33.33364, -87.9424
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating60.8 US tons
Inventory rating36.4 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans3
Design loadHS 20
Structure length102 ft (31.1 m)
Longest span34 ft (10.4 m)
Deck width28 ft (8.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic150 (2001)
Projected traffic220 by 2034
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed11.2 mi (18 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$836,000 (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was CR 57 over Holly Creek built?

It was built in 2002, making it 23 years old in 2025.

What condition is CR 57 over Holly Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does CR 57 over Holly Creek carry?

About 150 vehicles per day (2001 count).

How long is CR 57 over Holly Creek?

The structure is 102 ft (31.1 m) long with a longest span of 34 ft (10.4 m) and a deck 28 ft wide.

Who owns CR 57 over Holly Creek?

It is owned by the County Highway Agency.