FAS03DICKEY RD#3 over Relief Washington Creek
FairPosted for loadPerry County, Alabama · Tom Dickey Rd. · Structure no. 013122
- Built
- 1955
- 70 years old, rebuilt 1984
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Concrete Continuous
- Length
- 54 ft
- 2 main spans
- Daily traffic
- 150
- 1993 count
- Owner
- County
- County Highway Agency
About this bridge
FAS03DICKEY RD#3 over Relief Washington Creek is a concrete continuous stringer/multi-beam or girder carrying FAS03DICKEY RD#3 over Relief Washington Creek in Perry County, Alabama. It was built in 1955 and reconstructed in 1984, so it is 70 years old, older than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 150 vehicles a day, roughly 2% of them trucks, projected to reach 175 by 2033. The structure is 54 ft (16.5 m) long and 17 ft wide. If it were closed, the detour would be 8.7 mi (14 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAS03DICKEY RD#3 over Relief Washington Creek built?
It was built in 1955, making it 70 years old in 2025. It was reconstructed in 1984.
What condition is FAS03DICKEY RD#3 over Relief Washington Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does FAS03DICKEY RD#3 over Relief Washington Creek carry?
About 150 vehicles per day (1993 count), of which roughly 2% are trucks.
How long is FAS03DICKEY RD#3 over Relief Washington Creek?
The structure is 54 ft (16.5 m) long with a longest span of 27 ft (8.2 m) and a deck 17 ft wide.
Who owns FAS03DICKEY RD#3 over Relief Washington Creek?
It is owned by the County Highway Agency.