US Bridges

Martin Road over West Fork Cotaco Creek

FairPosted for load

Morgan County, Alabama · 4.0 MI N Cullman Coline · Structure no. 014028

Built
1986
39 years old
Condition
Fair
inspected September 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
40 ft
1 main span
Daily traffic
6
1986 count
Owner
County
County Highway Agency

About this bridge

Martin Road over West Fork Cotaco Creek is a steel stringer/multi-beam or girder carrying Martin Road over West Fork Cotaco Creek in Morgan County, Alabama. It was built in 1986, so it is 39 years old, younger than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 6 vehicles a day, projected to reach 15 by 2042. The structure is 40 ft (12.2 m) long and 14 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesMartin Road
CrossesWest Fork Cotaco Creek
Location4.0 MI N Cullman Coline
RouteCounty Highway 309
StateAlabama
Coordinates34.35839, -86.66722
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour above top of footing
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment4: Meets minimum tolerable limits to be left in place as is
Operating rating27.6 US tons
Inventory rating14.6 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadH 15
Structure length40 ft (12.2 m)
Longest span40 ft (12.2 m)
Deck width14 ft (4.3 m)
Roadway width12 ft (3.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6 (1986)
Projected traffic15 by 2042
Trucks0%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$200,000 (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Martin Road over West Fork Cotaco Creek built?

It was built in 1986, making it 39 years old in 2025.

What condition is Martin Road over West Fork Cotaco Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does Martin Road over West Fork Cotaco Creek carry?

About 6 vehicles per day (1986 count).

How long is Martin Road over West Fork Cotaco Creek?

The structure is 40 ft (12.2 m) long with a longest span of 40 ft (12.2 m) and a deck 14 ft wide.

Who owns Martin Road over West Fork Cotaco Creek?

It is owned by the County Highway Agency.